![]() |
|
|
Vacuum-FillingPSS installs, assembles and performs hot oil vacuum-filling on large power transformers. With a background in high voltage transformer manufacturing, PSS is acutely aware of the expertise required for transformer assembly.
The large vacuum system promptly pulls vacuum and maximizes our ability to remove moisture and air voids in the windings. Eliminating air voids is crucial for limiting corona discharges. The vacuum time is based on the transformer rating, voltage class and the customer's specifications. PSS's oil filling procedure involves circulating the oil through our processing rigs. The oil is heated, dehydrated, degassed and filtered through fuller's earth before entering the transformer. In addition, PSS continuously analyzes and monitors the oil during the transformer filling process. The detailed process ensures that the transformer receives the highest quality oil.
|
| 4 Industrial Park Drive | Wheeling, WV 26003 | P:304.232.1590 | F:304.232.1599 | email: eps@epsonline.com
Environmental Protection Services | EPS Industries Home | Oil Reclamation | Vacuum-Filling | Electrical Testing | PCBX | Field Repair | Contact Us |
|